Package A: SWPPP preparation and registration
For a site that needs permit coverage before ground disturbance, with its inspections handled separately.
- A site-specific SWPPP, prepared and signed by a QSD, with erosion, sediment and housekeeping controls (BMPs) keyed to the grading plans
- Risk level determination from the construction dates, soils, slopes and receiving waters
- SWPPP drawings and the monitoring program
- Permit Registration Documents prepared for your Legally Responsible Person (LRP) to certify in SMARTS; construction cannot begin until SMARTS issues the WDID