City of Chico · Form 30
Plot plans for a house or ADU in Chico
Inside city limits, the City of Chico's Form 30 asks for a plot plan showing the outline of the assessor's tax parcel and all existing and proposed buildings. Plan details must include parcel dimensions, building setbacks from all property lines, distance between buildings, off-street parking, driveways, sewer lines or septic tank and leach field locations, the percentage of the lot covered by buildings, the drawing scale and a north arrow.
On a tight lot, start with a boundary survey so setbacks are measured from surveyed lines. See plot plans for building permits.
-
Butte County · unincorporated
Site plans for county building permits
In the unincorporated county, outside any city or town, building permits go through Butte County Development Services, which sets its own site plan requirements. They vary by project type, so we work from the County's current checklist for your permit.
Well and septic permits in the unincorporated county go through Butte County Environmental Health. A new home on a lot without public sewer also needs a septic system design.
-
Grading & drainage
Grading and drainage plans
Chico's Form 30 notes that a project may also need other applications, such as grading, encroachment, and stormwater and erosion control, depending on its type, scope and location. Whether a grading permit applies depends on the agency and the amount of earthwork, so we confirm the current rule for your parcel before design starts.
Design starts from a topographic survey. See grading plans.
-
Stormwater
Stormwater calculations and SWPPPs
The City of Chico is covered by the statewide Small (Phase II) MS4 stormwater permit, which carries post-construction runoff rules for qualifying new and redevelopment projects. Where plan check asks for them, we prepare the stormwater calculations.
Construction that disturbs one acre or more, or is part of a larger common plan of development that does, needs coverage under the statewide Construction General Permit and a SWPPP. See SWPPP services and QSP programs.
-
FEMA · new flood maps
New flood zones in north Chico
FEMA's preliminary flood maps for Butte County and the City of Chico showed new flood zones in the north Chico area around Rock Creek, Kiefer Slough and Nord. The appeal period ran from December 3, 2025 to March 3, 2026. FEMA has since made the maps final: its Federal Register notice of August 21, 2026 sets January 8, 2027 as their effective date.
If a building there is newly mapped in, an elevation certificate records its elevations and can support a request to FEMA for a Letter of Map Amendment.
-
Paradise & Oroville
Town of Paradise and City of Oroville parcels
Parcels inside the Town of Paradise or the City of Oroville follow those agencies' own checklists. The Town of Paradise residential building permit checklist, for example, asks for a survey completed by a land surveyor or civil engineer licensed in land surveying.
See Paradise & the Ridge and Oroville & South Butte County.
Agencies update their checklists, and requirements vary by project. We prepare what the agency's current checklist requires; the agency decides whether a submittal is complete and whether to approve it.